Practice your Certified Cost Professional (CCP) certification test with free AACE-CCP exam cram and take control of your certification preparation. At FreeExamCram, you can practice online for free using real AACE-CCP exam dumps, verified questions, and expert-designed free online practice tests. Moreover our AACE AACE-CCP exam cram backed by our confidence-boosting refund guarantee.

A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.Select the statement that best describes the meaning of the +/-notations associated with an estimate. The actual cost is expected:
____________ is the application of total resources ($-workers-supports) and activity durations of the logic diagram.
Which statement accurately describes Just-in-Time (JIT) techniques for materials procurement?
In a manufacturing operation with the following annual cost structure, calculate the shutdown and break-even points as a percentage of total capacity.Fixed expenses: $5,203,440
Variable expenses: $7,091,040
Semi-variable expenses: $6,217,750
Sales: $26,385,480
Additional Information: Semi-variable expenses at zero production equal 30% of the expenses at full (100%) capacity.