Confidently Practice Online with Free CTAL-TTA_v.4.0_UK_IE Exam Cram

Practice your ISTQB Certified Tester Advanced Level - Technical Test Analyst (Syllabus 2019) certification test with free CTAL-TTA_v.4.0_UK_IE exam cram and take control of your certification preparation. At FreeExamCram, you can practice online for free using real CTAL-TTA_v.4.0_UK_IE exam dumps, verified questions, and expert-designed free online practice tests. Moreover our iSQI CTAL-TTA_v.4.0_UK_IE exam cram backed by our confidence-boosting refund guarantee.

Exam Code: CTAL-TTA_v.4.0_UK_IE
Exam Questions: 238
ISTQB Certified Tester Advanced Level - Technical Test Analyst (Syllabus 2019)
Updated: 26 Nov, 2025
Viewing Page : 1 - 24
Practicing : 1 - 5 of 238 Questions
Question 1

Exhibit:
ATTA-page23-image13
Identify TWO main advantages of this approach to incident management. 

Options :
Answer: A,B

Question 2

Subject to testing is a software system (COTS) for Project Administration and Control (PACS). PACS is a multi-project system for controlling the project time, e.g., in terms of scheduling and tracking, and managing the productivity of projects, e.g., in terms of effort and deliverables. During various interviews with stakeholders the following information was gathered: • Using PACS is not business critical. There is no impact such as high financial losses or problems to the operational continuity of an organization. Its application is not critical since the software package does not support directly the operational, or the primary, business processes of an organization. It supports (project) management in the project planning and tracking process. Of course, it will be highly annoying for users if the system “goes down” from time to time. Although this does not have a high impact for the business process as a whole, the Mean Time Between Failures (MTBF) still needs to be at a good level to be successful in the market. • Users of PACS typically have an academic educational level, but have no prior experience with this particular type of project management software. The system will be used by a large number of users within an organization. • The system will be used on a regular basis, e.g., several times per day by project managers and several times per week by project employees. This means that the system will not be used very intensively, often only for some data input or an information request. Its usage is not considered to be very time-critical. • The data is recorded on-line and real-time. The system is expected to run in multiple hardware environments in various network environments. It is also expected that changes in the operational environments will happen in the upcoming period that also need to be supported. Based on the information provided by the stakeholder, which combination of non-functional quality characteristics should you propose to test as part of your test approach?

Options :
Answer: A

Question 3

Which of the following is the most important benefit of making exploratory testing part of your test approach
for the “Bonus Program”?

Options :
Answer: D

Question 4

A product risk assessment has revealed the following product risks: • lack of usability requirements • security during on-line transactions • perceived performance of the system and response time from the user interface • a required availability of almost 100% To address the 4th risk, which of the following quality characteristics for technical testing should be part of the test approach?

Options :
Answer: B

Question 5

Which of the following does NOT contribute to a more effective review preparation by the Technical Test Analyst? 

Options :
Answer: B

Viewing Page : 1 - 24
Practicing : 1 - 5 of 238 Questions

© Copyrights FreeExamCram 2025. All Rights Reserved

We use cookies to ensure that we give you the best experience on our website (FreeExamCram). If you continue without changing your settings, we'll assume that you are happy to receive all cookies on the FreeExamCram.