Confidently Practice Online with Free PVIP Exam Cram

Practice your PV Installation Professional (PVIP) Board Certification certification test with free PVIP exam cram and take control of your certification preparation. At FreeExamCram, you can practice online for free using real PVIP exam dumps, verified questions, and expert-designed free online practice tests. Moreover our NABCEP PVIP exam cram backed by our confidence-boosting refund guarantee.

Exam Code: PVIP
Exam Questions: 70
PV Installation Professional (PVIP) Board Certification
Updated: 24 Aug, 2026
Viewing Page : 1 - 7
Practicing : 1 - 5 of 70 Questions
Question 1

The following dc portion of a PV schematic (functionally grounded conductor not shown) is submitted to the building official for permit approval. The building official, who also is he AHJ, allow the system to be installed by requiring what NEC-required MINIMUM size equipment grounding conductor at Location A?


Options :
Answer: B

Question 2

A project is using a PV module with a 25-38dc maximum power voltage range and a single input inverter with an operating windows of 250vdc-450dc. The dwelling the system is to be installed on has a 5:12 roof with a southeastem face that can accommodate 14 modules and southwestern face that can accommodate 10 modules. What is the MAXIMUM number of modules that can be installed for proper inverter maximum power point tracking?

Options :
Answer: C

Question 3

A PV system installation utilizes micro inverters connected to each module of the array. Each micro inverter has a nominal rated output of 250WV. Single phase. The microinverters are listed so that multiple inverters may be connected in parallel to a single feeder circuit, and each inverter has ancable and connector rated for 30A. What is the MAXIMUM number of inverters that may be wired together on a single 30A feeder circuit? 

Options :
Answer: C

Question 4

Which of the following is an NEC requirement regarding access for large-scale PV electric power production facilities? 

Options :
Answer: A

Question 5

A residential PV system uses two 120.240Vac utility-interactive inverters with a sealed lead-acid battery energy backup for protected loads. The MOST important protected load consideration when operating in the backup mode is that: 

Options :
Answer: B

Viewing Page : 1 - 7
Practicing : 1 - 5 of 70 Questions

© Copyrights FreeExamCram 2026. All Rights Reserved

We use cookies to ensure that we give you the best experience on our website (FreeExamCram). If you continue without changing your settings, we'll assume that you are happy to receive all cookies on the FreeExamCram.